PROJECT DETAILS:

MAS used a 275 Ton crane to erect these two garage top canopies located in Waltham, MA. With just 7 weeks to erect both canopies, MAS sequenced the job to ensure the schedule to be on time and on budget.

GENERAL CONTRACTOR: Columbia Construction Company

OWNER: Hobbs Brook Management, LLC

LOCATION: Waltham, MA

DURATION: 7 Weeks